Jun 22, 2021
Source:
Pacific Sun
On May 10, the Environmental Protection Agency (EPA) quietly signed off on a plan meant to reduce pollution in the 146-square-mile Petaluma River Watershed. That’s right. Although the problem is rarely discussed, the Petaluma River has been listed as “impaired” by excessive levels of bacteria since 1975. The bureaucratic document approved by the EPA is known as a Total Maximum Daily Load (TMDL). It sets levels of acceptable waste discharge from various sources in an attempt to lower the levels of fecal bacteria found in the watershed until the water is deemed clean.